Red Skelton Museum Addition - REBID
Status
Bidding Closed
Prebid Date | 9/10/24 10:00am |
Bid Date | 9/26/24 2:00pm |
Company
Plans and Specifications:
Notice is hereby given that sealed bids in duplicate for the Red Skelton Museum Addition and Related Work Rebid, Vincennes University, Vincennes, Indiana will be received by the Board of Trustees for the Vincennes University at the Office of the Architectural Services & Facilities, 817 North Second Street, Vincennes, Indiana 47591, until Thursday, September 26, 2024. 2:00 p.m. (LOCAL TIME). Bids will be opened and publicly read aloud immediately following.
A question and answer period will be held at the Office of Architectural; Services & Facilities, 817 North Second Street, Vincennes, Indiana, at 10:00 a.m., Local Time, on September 10, 2024. All bidders, both prime contractors and subcontractors, are urged to attend for the purpose of clarifying the meaning and intent of the Drawings and Specifications.
Method of Bidding: Contract #1: General Construction, Contract #2: Mechanical Construction, and Contract #3: Electrical Construction
Obtaining Drawings and Specifications: Copies of Plans and Specifications may be obtained from MACO-Evansville Blue, 600 Court Street, Evansville, Indiana 47708, (812.464.8108) by accessing our website at https://www.vuplanroom.com, using your company’s active account information to sign in. If your company is not currently registered, you should do so by clicking “Register for an Account”. You will receive an activation email to confirm your registration prior to signing in and ordering plans. Registered account holders may download digital files for a nominal fee.
Prime contract bidders may obtain bidding documents for a deposit of $200 for each complete set. A separate $20 check made payable to MACO-Evansville Blue is required for shipping charges. Prime bidders may have two (2) complete sets on a refundable basis if: 1) a responsible bid is received and documents are returned directly to the Office of the Architect in good condition within thirty (30) days of receipt of bids; 2) the prospective bidder notifies the Architect of his/her intention not to bid and returns the bidding documents in good condition at least seven (7) days prior to receipt of bids. Any plan holder not in conformance with Item 1 or 2 noted above will forfeit their plan deposit. Deposits should be made payable to Vincennes University.